Before we go surveying I have about 2 hours of preparation to do this
involves warming up the survey equipment
racks to a workable temperature i.e. +6°C and then checking the
equipment is functioning. Finally a gravity still
reading is started and this takes 1 hour. Finally we are
ready to fly survey.
At Talos it wasn't just us but a French/Italian drilling project as
well, above is the helicopter brining in a support beam
for the roof.
In a spare moment I built a new base for BAS!! Snows a bit dry for such
things so now snow people (since NERC are PC).